Projects notified ex-ante

2024
2019
2016
2014
2008
2007

2024

Project name: Standard Gauge Railway Lots 3 & 4 (Makutupora to Tabora and Tabora to Isaka)

Location: Tanzania

Project description: The Project involves the construction, commissioning and operation of a new, electrified standard gauge railway in two geographically defined Lots:

  • Lot 3; consisting of 294 km mainline and 74 km of sidings/passing loops from Makutupora to Tabora, traversing through Manyoni District in the Singida Region, and Sikonge, Uyui and Tabora Districts in Tabora Region;
  • Lot 4; consists of 130 km of mainline and 35 km of sidings/passing loops from Tabora to Isaka, traversing through Tabora, Uyui and Nzega Districts in the Tabora region, and Kahama District in the Shinyanga Region.

Documents provided for environmental and social impact review:

  • Questionnaire on environmental and social impacts of the Project
  • Environmental and Social Impact Assessment Report prepared by RSK Environment (East Africa) Limited, 31 March 2024
  • Other documents, studies and plans.

International Standards applied:

OECD Recommendation of the Council on Common Approaches for Officially Supported Export Credits and Environmental and Social Due Diligence (the “OECD Common Approaches”) (2016).

  • Equator Principles II, III, IV, V & VI (2020)
  • The International Finance Corporation (IFC) E&S Performance Standards (2012)
  • World Bank Group EHS Guidelines (2007), including:
    General EHS Guidelines
    EHS Industrial Sector Guidelines for Railways; and
    EHS Industrial Sector Guidelines for Construction Materials Extraction.

Category A project

The information was made public on Apr. 18-th, 2024.

Download

Environmental documentation can be downloaded from the website Contractor Yapi Merkezi İnşaat ve Sanayi Anonim Şirketi:

Lot 3
https://yapimerkezi.com.tr/Projeler/Devam-Eden-Projeler/Makutupora-Tabora-Demiryolu

Lot 4
https://yapimerkezi.com.tr/Projeler/Devam-Eden-Projeler/Tabora-Isaka-Demiryolu

2019

Project name: Engineering works and supply of equipment for Orion Power Unit-2 Coal based Thermal Power Plant in Dhaka, Bangladesh.

Location: Dhaka, Munshiganj District, Bangladesh.

Project description: Engineering works and supply of equipment for Orion Power Unit-2 Coal based Thermal Power Plant with net output of 635 MW built by Orion Power Unit-2 Dhaka Limited

Documents provided for environmental and social impact review:

  • Questionnaire on environmental and social impacts of the Project
  • Environmental Impact Assessment Study (ESIA Report) prepared by AECOM India Private Limited, signed January, 2018
  • Socio-Economic Environment Study prepared by Adroit Environment Consultants Ltd (AECL), signed October, 2016

International Standards applied:

  • IFC Performance Standards:
  • Performance Standard 1: Assessment and Management of Environmental and Social Risks and Impacts
  • Performance Standard 2: Labor and Working Conditions
  • Performance Standard 3: Resource Efficiency and Pollution Prevention
  • Performance Standard 4: Community Health, Safety and Security
  • Performance Standard 5: Land Acquisition and Involuntary Resettlement
  • Performance Standard 6: Biodiversity Conservation and Sustainable Management of Living Natural Resources

IFC Environmental Health and Safety (EHS) Guidelines:

  • General EHS Guidelines
  • EHS Guidelines for Thermal Power Plants

Category A project

The information was made public on 20.09.2019.

2016

Project: Supply of mining equipment to Amasra B Coal Mine Project in Turkey

Location: Amasra District of Bartin Province, West Blacksea Region, Turkey.

Project description: Supply of mining equipment, including four longwalls, belt conveyors, chain conveyors, TH profiles and attachment sets to Amasra B Coal Mine Project in Turkey

Documents provided for environmental and social impact review:

  • Questionnaires on environmental and social impacts dated 28.05.2015, 14.07.2015 and 17.08.2015
  • Environmental and Social Impact Assessment Report (ESIA Report), signed by ELC Group (a company of Royal HaskoningDHV), Istanbul, Turkey, received 19.06.2015 (draft) and 11.09.2015 (final draft)

International Standards applied:

IFC Performance Standards:

  • Performance Standard 1: Social and Environmental Assessment and Management Systems
  • Performance Standard 2: Labor and Working Conditions
  • Performance Standard 3: Pollution Prevention and Abatement
  • Performance Standard 4: Community Health, Safety and Security
  • Performance Standard 5: Land Acquisition and Involuntary Resettlement
  • Performance Standard 6: Biodiversity Conservation and Sustainable Natural Resource Management
  • Performance Standard 8: Cultural Heritage

IFC Environmental Health and Safety (EHS) Guidelines:

  • General EHS Guidelines
  • Industry Sector Guidelines:
  • IFC EHS Guidelines for Mining

Category A project

The information was made public on 19.05.2016.

ESIA Report 2017 - made public 28.03.2018

2014

Project: Construction of a duck farm in Ukraine

Location: Evmynka village, Kozeletskyi District, Chernigiv Region, Ukraine

Project description: Construction of a duck farm in Ukraine (1st stage) with planned capacity of 864 thousands of ducks and planned production in amount of 5,4 m ducks per year

Documents provided for environmental and social impact review:

  • Questionnaire on environmental and social impacts dated 8.11.2013
  • Environmental impact assessment report, signed by LLC Interproject GMBH, Kiev, received 30.01.2014
  • Additional explanations and documents obtained from investor 31.12.2013, 22.01.2014, 30.01.2014

International standards applied in benchmarking process:

IPC Performance Standards:

  • Performance Standard 1: Assessment and Management of Environmental and Social Risks and Impacts
  • Performance Standard 2: Labor and Working Conditions
  • Performance Standard 3: Resource Efficiency and Pollution Prevention

Environmental Health and Safety (EHS) Guidelines:

  • General EHS Guidelines
  • Industry Sector Guidelines:
  • Environmental, Health, and Safety Guidelines for Poultry Production
  • Environmental, Health, and Safety Guidelines for Poultry Processing

Information made public on 31.01.2014.

2008

Project: The mining and production complex of construction aggregate with a port

Description and location: Construction of a mining and production complex of construction aggregate with a port (embankments, loading equipment, a site for storing of aggregate) in Republic of Karelia, Russian Federation.

Download: Environmental Impact Assessment Report www.wiedemann.com.pl/karelia

Information made public on 3.03.2008.

2007

Project: Construction of a power plant in Macedonia

Environmental Assessment Report available for download below.

More information is also available on the Euler Hermes website.

Information made public on 31.10.2007.

Our solutions

Do you have trouble selecting the right solution for your business? Contact us!
Our consultant will help you choose the right package of solutions to support your company's foreign expansion.

News and insights

Over the past 30 years, thousands of Polish companies* have benefited from our solutions enabling safe growth of their business in Poland and worldwide.
*from small family businesses, through medium-sized companies to the largest international corporations